Testing and evaluation of the wastewater treatment system at HTP building – district 9

FPT Building F1-F2, Thu Duc City 2014 AO (Anoxic + Aerotank)
  • Accepted & Handed Over
  • Complete Solution
35 % Increase processing efficiency
180m³/day.night Capacity

Project Overview

NTS Engineering Co.,Ltd tests and evaluates the wastewater from the High-Tech Park (HTP) – FPT Building (F1–F2) in Thu Duc by conducting sampling, analysis, and comparison with current standards. This process determines the level of pollution, assesses treatment efficiency, and allows for system adjustments to minimize negative impacts on the surrounding environment.

All wastewater from the HTP building is collected and directed to the wastewater treatment system, which is designed with a treatment capacity of 180 m³/day.night. Through testing and evaluation, NTS Engineering Co.,Ltd found that the influent had a low flow rate, white foam appeared in the equalization tank, and several wastewater parameters had not reached ideal levels.

Faced with the above issues, NTS quickly resolved each issue, ensuring the system operates more efficiently, stably, and appropriately.

Kiểm tra và đánh giá chất lượng nước thải FPT

Kiểm tra và đánh giá chất lượng nước thải FPT

Investor's Challenge

Challenge

Some of the challenges that NTS found after evaluating the wastewater at the project are as follows:

  • The system has an actual wastewater flow that is too low compared to the tank system's capacity. The reason was the reduction in building operations during the COVID-19 period (2020–2021), which led to a much lower influent volume than the originally calculated design capacity
  • The equalization tank has white foam. This may be due to the influent containing too many types of cleaning chemicals

The above problems affect the system's treatment quality. Therefore, NTS needs to take prompt and appropriate corrective measures.

NTS Technology Solution

Solution

From the wastewater test results, NTS has proposed appropriate solutions for each problem, specifically:

  • Adjust the discharge valve of the air conditioner pump to help the system operate smoothly with appropriate capacity
  • Other solutions are listed in detail in the Analysis Results Report sent to the Investor

 

Results

The system has resumed stable operation, and the treated wastewater meets the required standards. The effluent ensures environmental safety, contributing to green - clean- sustainable operations.

Summary table of typical treated wastewater parameters after inspection:

Items Value Unit

Capacit

180

m3/day.night

BOD Removal Efficiency

< 40

mg/L

COD Removal Efficiency

< 80

mg/L

Total Coliform

< 3000

MPN/100ml

35 % Increase processing efficiency
40 % Reduce energy costs
In-Depth Consultation

Discuss Your Project

Send your request along with drawings or a BOQ (if available). NTS engineers will analyze and advise on a suitable water treatment solution as soon as possible.

  • Survey & consultation tailored to technical requirements
  • Technology proposal & preliminary estimate
  • Your information & documents are kept confidential