Home Project Water treatment project Renovating the domestic wastewater treatment system at Ben Thanh tourist area, Ho Tram
Water treatment project

Renovating the domestic wastewater treatment system at Ben Thanh tourist area, Ho Tram

Phuoc Thuan Commune, Xuyen Moc District, Ba Ria Vung Tau Province 2025 AO combined with MBBR
  • Accepted & Handed Over
  • Complete Solution
Overview of Ben Thanh Ho Tram project
90 % BOD/COD
470m³/day.night Capacity

Project Overview

The project to renovate the domestic wastewater treatment system at Ben Thanh Tourist Area - Ho Tram, implemented by NTS Engineering Co., Ltd, aims to improve the overall treatment efficiency and ensure that the effluent meets QCVN 14:2008/BTNMT, k=1,0, Column A standards. The system has a capacity of 470 m³/day.night, applying AO technology combined with MBBR. The renovation process is carried out according to plan, ensuring that the renovation process does not interrupt the treatment stages in each tank and brings overall efficiency.

Renovation of domestic wastewater treatment system of Ben Thanh Ho Tram tourist area is being implemented
Renovation of domestic wastewater treatment system of Ben Thanh Ho Tram tourist area is being implemented
Investor's Challenge

Challenge

The renovation process has some challenges as follows:

  • With a location near the beach, the project requires strict treatment standards, the effluent must ensure water quality according to column A ,QCVN 14:2008/BTNMT, k=1.
  • The renovation process is carried out concurrently with the collection and treatment of wastewater continuously generated from the tourist area’s operations, ensuring no impact on or disruption to other activities within the project.
  • Ensure strict compliance with labor safety regulations and construction standards to help prevent labor risks and avoid negative impacts on investors.
  • Ensure that the treated wastewater during the renovation process still meets output standards. It is necessary to absolutely control to avoid discharging substandard wastewater into the environment.
  • The construction environment in a closed space has many potential toxic gases and occupational safety risks. Therefore, it is necessary to proactively take measures to protect construction worker.
NTS Technology Solution

Solution

NTS implements the renovation plan as follows:

  • Develop a plan to isolate each treatment tank for renovation to avoid interruption of treatment processes.
  • Apply construction methods to suit and not affect the surrounding space and customer experience.
  • Comply with the principle of "No illegal discharge", temporarily store wastewater in the equalization tank, and complete the construction within the day to ensure that treated effluent meets requirements.
  • When working in a closed tank, ít is necessary to set up a ventilation fan and assign at least two employees to ensure safety and promptly address any problems that may arise.

Results

After the renovation, the system operates stably, meets with QCVN 14:2008/BTNMT, Column A, k=1. The construction process ensures absolute safety, does not interrupt activities, and does not affect the operation of the tourist area.

The table below summarizes several effluent quality parameters after inspection and renovation:

Parameter Value (Achieved) Unit

pH

7,39

-

TDS

402

mg/L

TSS

37

mg/L

BOD₅

23

mg/L

Sunfua

KPH, MDL = 0,03

mg/L

NH₄⁺

3,6

mg/L

NO₃⁻

KPH, MDL = 0,02

mg/L

PO₄³⁻

2,99

mg/L

Oils and Greas

KPH, MDL = 1

mg/L

Surfactants

KPH, MDL = 0,03

mg/L

 Coliform

17x10^2

MPN/100ml

90 % BOD/COD
25 % Reduce energy costs
In-Depth Consultation

Discuss Your Project

Send your request along with drawings or a BOQ (if available). NTS engineers will analyze and advise on a suitable water treatment solution as soon as possible.

  • Survey & consultation tailored to technical requirements
  • Technology proposal & preliminary estimate
  • Your information & documents are kept confidential